Hello Everyone,
On Tuesday December 3, 2019, the FCC released the
much-anticipated Category 2 Order,
outlining the rules for Funding Year 2020 and beyond. As a whole, there is
much to celebrate! FY2020 will be a “transition” year with basically the
same rules as the last 5 years, except the C2 budget multiplier will have a
1-year “additive.” The big changes come in FY2021 when a new, set 5-year
C2 cycle will begin, all C2 budgets will be reset, budgets will be calculated
district-wide instead of by school, the minimum building amount will be
increased significantly, and much more.
Below is a summary of the 2020 and 2021 changes in the rules
for Category 2. Over the next week, I’ll be digging into more details and
clarification about applying for Category 2.
FY 2020 (only)
- Extended
the initial 5-year C2 cycle for a 6th year (FY2020).
- During
this year, C2 budgets will continue to be calculated at a school/library
building level.
- Unused
C2 budgets from initial 5-year cycle will be available for FY2020, plus a
20% increase in the C2 budget multipliers which I believe, based on my
reading of the Order, will be:
- Schools: $195.63/pp/school
- Libraries:
$6.52/sq. ft. for libraries with locale codes 11, 12, 21. All other
libraries $2.99/sq. ft.
- Minimum/building:
$11,998.43
- Formula:
C2 multiplier (x) school building enrollment, minus any committed C2
funding since in FY 2015 (pre-discount amounts) for each school.
- BOTTOM
LINE: FY2020 is a use-it or lose-it year for C2, with a
1-time bump in available funding, so please use it.
FY 2021 – FY 2025
- Establishes
a set 5-year C2 cycle, FY 2021 – FY 2025, for all applicants.
- All C2
budgets will be reset in FY 2021 (and at the beginning of each new 5-year
cycle). No unused C2 budgets from prior 6-year C2 cycle will be
carried forward.
- C2
budget will be calculated at district or library system level, instead of
at building level.
- Budget
multiplier for FY 2021 – 2025 (will not be adjusted annually for
inflation):
- Schools:
$167.00/pp
- Libraries:
$4.50 (ALL libraries will use this amount)
- Minimum/building:
$25,000 (increase from $9,200)
- Schools
with 10 schools or less can take advantage of the higher budgets for each
school (enrollment or minimum)
- Enrollment
will remain static for entire budget cycle, based on the first year a
district applies for C2. Optional: schools may update C2 budget
enrollment in subsequent year(s) if enrollment increases.
- No funding available for non-instruction facilities (no change).
- Equipment transfer restrictions will be eliminated beginning in FY 2021 but applicants must record reason and date of transfer and update asset inventory. No notice to USAC is required.
Let me know if there are questions.
Todd
No comments:
Post a Comment